Hotels & resorts
The Pullman Melbourne on the Park
- The challenge
- A failing concrete rooftop pool on the 7th floor opposite the MCG, leaking, cracking and driving up energy and maintenance costs after only 12 years. The replacement had to fit the existing footprint and floor level, avoid major structural works and go in during a single Sunday-morning crane window.
- The solution
- A bespoke custom-jointed Maxi Rib fibreglass pool, joined off-site and lifted to the 7th floor as a single unit, freestanding inside the original concrete structure with paving framed to match and an in-floor cleaning system.
- The outcome
- Still performing more than 15 years on with no resurfacing, and installed in a single Sunday lift with no disruption to hotel operations.